- Project
3 Clampon Project
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 3
Piping Inch Dia 9,500
Structural In MT 257
- Year
2011 – 2012