- Project
BW Pipeline Replacement Project – 4
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 31
Piping Inch Dia 26,900
Structural In MT 600
- Year
2017 – 2018