Project Detail

BW Pipeline Replacement Project – 4

BW Pipeline Replacement Project – 4

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform       31
Piping Inch Dia       26,900
Structural In MT     600

2017 – 2018

BW Pipeline Replacement Project – 4

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform       31
Piping Inch Dia       26,900
Structural In MT     600

2017 – 2018