Project Detail

Cluster 26 Project (C26 Project)

Cluster 26 Project (C26 Project)

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform     8
Piping Inch Dia     8,834
Structural in MT   420

2014 – 2015

Cluster 26 Project (C26 Project)

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform     8
Piping Inch Dia     8,834
Structural in MT   420

2014 – 2015