Cluster 26 Project (C26 Project)
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 8
Piping Inch Dia 8,834
Structural in MT 420
- Year
2014 – 2015