- Project
Pipeline Replacement Project – 2
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 64
Piping Inch Dia 50,504
Structural In MT 1,014
- Year
2009 – 2011
PROJECT
Pipeline Replacement Project – 2
SCOPE
YEAR
2009 – 2011