Pipeline Replacement Project – 2

Pipeline Replacement Project – 2

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform       64
Piping Inch Dia       50,504
Structural In MT    1,014

2009 – 2011

PROJECT

Pipeline Replacement Project – 2

SCOPE

YEAR

2009 – 2011

Pipeline Replacement Project – 2

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform       64
Piping Inch Dia       50,504
Structural In MT    1,014

2009 – 2011

PROJECT

Pipeline Replacement Project – 2

SCOPE

YEAR

2009 – 2011