- Project
Pipeline Replacement Project – 3
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 59
Piping Inch Dia 24,710
Structural In MT 1,081
- Year
2012 – 2014