- Project
Pipeline Replacement Project – 4
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 64
Piping Inch Dia 58000
Structural In MT 1120
- Year
2014 – 2016