The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform      64
Piping Inch Dia      58000
Structural In MT    1120

2014 – 2016

Pipeline Replacement Project – 4

The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.

No. of Platform      64
Piping Inch Dia      58000
Structural In MT    1120

2014 – 2016