- Project
WIN Revamp Project
- Scope
The scope of work for the project include Surveys (pre-construction/pre-installation and post-installation), Fabrication, Topside Modifications on existing facilities and Demolition of Topside facility.
No. of Platform 1
Piping Inch Dia 25,631
Structural In MT 157
- Year
2011 – 2012